Tertiary
Air conditioning World Trade Center Barcelona (WTC)
Promoter:
CBRE
Location:
Barcelona
Year:
2021
Services:
Executive
Project Construction
Management SS Coordination
Description:
The project consisted of the refurbishment of the air conditioning installation of the three office buildings that make up the WTC in Barcelona to replace the production equipment.
The design was made to increase performance and ensure operational continuity with current standards.